简体版 | 繁體版 | English | Site Map | Print Page    
HOMEABOUT USBUSINESS AREASINVESTOR RELATIONSNEWS CENTERENVIRONMENTSOCIAL RESPONSIBILITYCAREERSCONTACT US
 
Stock
 
Stock Code: 144
Delayed Price: HK$  
BUSINESS AREAS
Ports Business   Sri Lanka

Colombo International Container Terminals Limited
(CICT)

Contacts
Address :Colombo International Container Terminals Limited
Port of Colombo, 120/20, Marine Drive Road, P.O. Box 0960, Colombo 01, Sri Lanka.

Tel.  :+94 0 11 2 666888
Fax   :+94 0 11 2 666777
Email :info@cict.lk
Web   :www.cict.lk

Colombo International Container Terminals Ltd., (CICT) is a joint venture Company between China Merchants Holdings (International) CO., Ltd. (CMHI), and the Sri Lanka Ports Authority (SLPA). It is developing the 2.4 million teus capacity Colombo South Container Terminal in the Port of Colombo under a 35 year build, operate, and transfer agreement with the SLPA. The largest shareholder of this company is CMHI with 85% ownership and the balance 15% being held by SLPA.

CICT commenced construction works of the terminal in December 2011. With an envisaged investment of US$ 500 million, including the installation of the latest state of the art terminal equipment, it is so far the single largest foreign direct investment in Sri Lanka by a private entity.

The Port of Colombo with a current capacity of over 4 million teus, has embarked on a large infrastructure development programme to increase the total capacity of the Port of Colombo by another 7.2 million teus in three separate phases.

The Colombo South Harbour Development which consists of three independent dedicated container terminals will create this additional capacity in three dierent phases of 2.4 million teus, in each phase.

CICT will be the rst terminal to come on stream in the Colombo South Harbour project. The construction is scheduled to be completed in three stages with the rst stage scheduled to go into operation in July 2013, and full completion planned for April 2014.


Terminal Specifications (06.2012)

 

Stage 1

Stage 2
Stage 3

Quay wall
(Terminal)

Complete 400m terminal and necessary facilities for operation
Complete 600m terminal and necessary facilities for operation Complete 1,200m terminal and necessary facilities for operation
 
July 2013
December 2013 April 2014
Milestone
-18m
-18m -18m
Berth depth
20m depth with two lane traffic access
Reefer Power
380 points
760 points 1150 points
Quay crane
3units:
Rail span (30m)
Outreach (70m)
Working load
Under hook (75t)
6units:
Rail span (30m)
Outreach (70m)
Working load
Under hook (75t)
12units:
Rail span (30m)
Outreach (70m)
Working load
Under hook (75t)
RTG/ERTG
10units:
1HC over 6HC
6+1 Stacking
Working load
Under spreader (40.5t)
20units:
1HC over 6HC
6+1 Stacking
Working load
Under spreader (40.5t)
40units:
1HC over 6HC
6+1 Stacking
Working load
Under spreader (40.5t)
Terminal Tractors
18
36 72
Container yard
10ha
20ha 58ha


Disclaimer
@2008 China Merchants Holdings (International) Co., Ltd. .All Rights Reserved.
ICP 05068163